Construction projects at the oil and gas infrastructure facilities often encounter situations that prevent construction work from progressing in a timely manner. Such situations comprise:
- Discrepancies between the drawings of different project disciplines (foundations, steel structures, piping, electrical utilities, etc.)
- Discrepancies between the drawings and the actual location of the existing facilities during their upgrade
- Difficulties in determining the exact dimensions of a pipe spool for subsequent fabrication and installation
- Determining the correct logic of construction
To eliminate such difficulties, we thoroughly analyse design documentation and create a 3D model of the future facility at the pre-construction stage. This approach enables us to:
- Eliminate maximum discrepancies and errors in design documentation
- Determine the construction process logic
- Identify the exact size of pipe spools, fabricate them on the territory of the production yard, which allows to minimize hot works on the territory of a hazardous production facility
- Visualize the future facility