4th Injection Compressor. Additional roads. Checkpoints No. 1 and No. 2

Temporary checkpoints (Checkpoint No. 1, 2) in the direction of Unit-2 and Unit-3 shall be constructed to eliminate “bottlenecks”, ensure effective traffic movement and prevent traffic congestion during delivery of 4th Injection Compressor Project. The scope of work includes the construction of sites and installation of 2 checkpoints, as well as road broadening in the area of Checkpoint No. 1 with the arrangement of asphalt pavement.